Main Objectives
- Decarbonization of Buildings: Reduce emissions by replacing a portion of natural gas with green hydrogen.
- >Operational Optimization: Ensure boilers and burners adapted for the hydrogen-gas mix operate safely and efficiently.
Key Features
- Hydrogen Supply: The supply of green hydrogen is foreseen to be in high-pressure gas cylinder racks adjusted to season needs, with the pilot building consuming a total of 767 kg/year.
- Monitoring Systems: Real-time diagnostics ensure the safe and optimal operation of gas-using equipment.
- Hydrogen Mix: Hydrogen is blended at a ratio of 20% with natural gas.
Specific Actions
- Collaborate with PRF to design and implement a hydrogen-natural gas blending system.
- Adapt and monitor gas equipment in pilot buildings using diagnostic sensors.
- Develop a public procurement plan for acquiring and installing technical equipment.
- Operate the system, collect performance data, and validate results for scaling and replication.
Benefits
This initiative demonstrates the practical integration of hydrogen into the existing gas supply system of the Évora’s Swimming Pool, paving the way for significant carbon reductions in recreational buildings. By partnering with CME, HL, UEvora, PRF and UNL, the project ensures a holistic approach to green energy adoption. Évora’s case study serves as a blueprint for decarbonizing public buildings and expanding hydrogen’s role in urban energy systems.
